In this episode, we sit down with Kelly Schupp, ASME PCC Standards Chair and Consulting Engineer at Equity, to dive into the world of Post Construction Code. Kelly takes us behind the scenes of PCC-1, PCC-2, and PCC-3, explaining why PCC-1 dropped “Guidelines for” from its title, what makes flange criticality ranking so challenging, and where facilities can improve their approach to flange assembly QA/QC.

The conversation also explores FRP composite repairs, including surface preparation, force-curing pitfalls, emerging inspection technologies for detecting laminations, and why understanding the underlying damage mechanism is often more important than the repair itself. We also hear about Kelly's journey into ASME standards development, and her progression from alternate committee member to PCC-1 Vice Chair, along with advice for engineers interested in contributing to the process.

If you enjoyed this discussion, subscribe to Upon Further Inspection to follow our conversation with Kelly Schupp into part 2 and stay informed about upcoming episodes.

01:09 What PCC 1, 2, and 3 Cover

04:22 How PCC-1 Became a Standard

06:15 Criticality Ranking for Flanges

08:21 Building a Flange Program at BASF

12:15 Setting Up a Criticality System

13:48 The Trouble with “Critical” in Codes

16:17 Gaskets in Corrosive Services

19:07 FRP Design and Contractor Reliance

22:56 Watching Fiberglass Layup as a Kid

23:33 New Inspection Tech for Composite Wraps

24:31 Why Surface Prep Gets Overlooked

28:36 Managing Temporary Repairs

29:32 The 15-Year Coating Showdown

31:09 FRP Defined and Flange Hold Points

35:30 Why Flanges Lack NDE Like Welds

37:26 Why Flange Failures Go Untracked

38:10 ASME’s New FRP Design Code

39:06 How Kelly Got Into Codes and Standards

44:00 Bringing End-User Voices to the Table

47:12 Why More End Users Are Showing Up

49:18 What Makes a Good Committee Volunteer

Episode Acronyms & Abbreviations

API  – American Petroleum Institute 

ASME – American Society of Mechanical Engineers

BASF –  Badische Anilin- & Soda-Fabrik

FRP – Fiberglass Reinforced Polymer

HF – Hydrofluoric Acid

NDE – Nondestructive Examination

PCC  – Post-Construction Committee

PCC-1 – Pressure Boundary Bolted Flange Joint Assembly

PCC-2 – Repair of Pressure Equipment and Piping

PCC-3 – Inspection Planning Using Risk-Based Methods

PQR – Procedure Qualification Record

PVP – Pressure Vessels and Piping Conference

QA/QC – Quality Assurance/Quality Control

RCA – Root Cause Analysis

SAP – Systems, Applications, and Products in Data Processing

UT – Ultrasonic Testing

WPS – Welding Procedure Specification



Send a text & tell us what you think!

Thank you for listening to Upon Further Inspection! If you enjoyed this episode, be sure to follow or subscribe so you don’t miss the next one. 

 We’d love to hear from you—connect with us on LinkedIn and share your thoughts on the episode. Have ideas for future topics or guests? Email us at inspectionpodcast@gmail.com.

Join us next time, wherever you get your podcasts. Until then, stay safe and stay informed.

Note:  The views and opinions expressed by the guest are their own and do not necessarily reflect those of the hosts or the Upon Further Inspection podcast. This podcast is for informational purposes only and does not constitute legal or professional advice. Listeners should seek their own qualified advisors for guidance.

People on this episode